  1. 2024
    • Performed Philippine ILIJAN GEN rotor repair

    • Performed SIEMENS 300[Mw]class 3 generator O/H with Robotic Inspection

    • Perforrmed POSCO Indonesia Blower Motor rotor Major O/H TA

    • Performed 100[Mw]급 SIEMENS GVPI GEN stator full rewinding

  2. 2023
    • Performed PAKISTAN THAR Water cooled GEN WTR Leak Repair

    • Performed MEIDENAHS GVPI Generator rotor full rewinding

    • Performed GEN stator, rotor repair of Nigeria eGBin HITACHI

    • Performed simultaneously 200[Mw]class 3 Gen’s Major Overhaul

  3. 2022
    • Performed 150[Mw]class Generator rotor full rewinding

    • Start FFA, HIT SKID Project(Sejong)

    • Start installation project of Synchronous Circuit Breaker (HITACHI)

    • Performed Foreign Project(Pakistan ENGRO Fertilizer)

  4. 2021
    • Performed 300[Mw]class GEN Stator full rewinding

    • Start Generator Collector Ring machining/replacement project

    • Move ENG1 main office(83-13 Singeumsandan 5gil Okgok Myun Kwangyang City JeollanamDo)

    • Open ENG1 Sejong office

    • Open ENG1 Seoul office

    • Construction of ENG1 main office(Main office & Service shop)

  5. 2017
    • Established ENG1 Co(38 Keumsungro Keumsung myun hadong gun Kyungnam province)